No. It is not possible to transfer the job data from RasterLinkPro5 to RasterLink6. If you want to load the job data which is edited in RasterLinkPro5 or former version into RasterLink6, it is necessary to load the original image data into RasterLink6 and apply the settings manually.
Go back